
Virtual factory tour
Most supplier sites show the same licensed photos. This is the actual line in Hangzhou — building 9, four SMT lines, the inspection equipment, and the people who sign off on a lot. Look first, then decide whether the BOM leaves your network.
Where the work actually happens
1,500 m² on the fifth floor of Building 9, Binhe Wealth Factory, Lin'an District, Hangzhou. The same address appears on every certificate and every shipping document — if it does not match, do not send anything.


Every photograph on this page was taken inside the plant in November 2026. None of it is stock imagery. If you would rather see it live, we will walk a camera down the same aisle on a call.
Four placement lines, not one
01005 to BGA, 0.2 mm pitch, double-sided and mixed-technology builds. Four lines in parallel is the difference between a plant that can take your 200-piece pilot and one that can also take the 20,000-piece follow-on without re-quoting the process.




Through-hole work stays in the same building
Connectors, transformers and large through-hole parts are hand-assembled and selectively soldered beside the SMT lines. Nothing is trucked to a second site mid-build, which is where most schedule surprises come from.


The equipment that looks underneath
Every joint on a BGA is invisible from the outside. SPI catches paste volume, AOI catches placement, X-ray measures voiding, and a functional fixture proves the board works before it is packed — not after it reaches you.






Enclosure and board, same roof
In-house tooling and injection moulding mean the housing is not waiting on a third-party moulder while your boards sit finished in a rack.



The paperwork, and where it comes from
Certificates are issued to our Chinese legal entity — Hangzhou Xingkong Zhilian Technology Co., Ltd. The name on the certificate differs from the trading name used on this site. Same company, same plant, same address. That is the only reason the wording differs.



Get the certificate set
Four PDFs, downloadable immediately — no waiting on an email. ISO 9001:2015 in English and in Chinese, IATF 16949:2016, and page one of the SGS audit report. The full SGS report names the client, so that one goes out under a mutual NNN.
Three ways to close the gap
Pick whichever removes the doubt fastest. None of them require you to send a file first.
Walk the line live
30 minutes on Teams or Zoom. Tell us which process you care about — placement, X-ray, final test — and we point the camera at it, including the parts a brochure would skip.
Read the certificates
IATF 16949, ISO 9001, and the SGS audit report. Ask for the set and we send the scans, including the scope statements and expiry dates.
Sign the NNN first
Non-disclosure, non-use, non-circumvention. Fill it in, sign it, send it back — then the BOM and Gerber can follow with the paperwork already in place.