Home / Factory tour
Before you send files

Virtual factory tour

Most supplier sites show the same licensed photos. This is the actual line in Hangzhou — building 9, four SMT lines, the inspection equipment, and the people who sign off on a lot. Look first, then decide whether the BOM leaves your network.

The site

Where the work actually happens

1,500 m² on the fifth floor of Building 9, Binhe Wealth Factory, Lin'an District, Hangzhou. The same address appears on every certificate and every shipping document — if it does not match, do not send anything.

Factory building exterior
Building 9, Binhe Wealth Factory — the address printed on our certificates
Factory entrance
The entrance on Binhe Road, Lin'an District, Hangzhou

Every photograph on this page was taken inside the plant in November 2026. None of it is stock imagery. If you would rather see it live, we will walk a camera down the same aisle on a call.

Line 1 — SMT

Four placement lines, not one

01005 to BGA, 0.2 mm pitch, double-sided and mixed-technology builds. Four lines in parallel is the difference between a plant that can take your 200-piece pilot and one that can also take the 20,000-piece follow-on without re-quoting the process.

Yamaha SMT placement line
Yamaha high-speed placement — four lines run in parallel under one roof
Solder paste printing
Solder paste printing at the head of the line, SPI immediately downstream
Ten-zone reflow oven
Ten-zone lead-free reflow; the profile is logged per product, not per machine
Second reflow line
Second reflow line for double-sided and mixed-technology builds
Line 2 — DIP and selective soldering

Through-hole work stays in the same building

Connectors, transformers and large through-hole parts are hand-assembled and selectively soldered beside the SMT lines. Nothing is trucked to a second site mid-build, which is where most schedule surprises come from.

DIP assembly stations
DIP hand-assembly and selective soldering stations beside the SMT lines
PCB magazines
Bare boards staged in magazines, counted in against the BOM before the run
Line 3 — Inspection and test

The equipment that looks underneath

Every joint on a BGA is invisible from the outside. SPI catches paste volume, AOI catches placement, X-ray measures voiding, and a functional fixture proves the board works before it is packed — not after it reaches you.

AOI inspection
In-line AOI with live board imaging at the console
X-ray CT system
Microfocus X-ray CT (SEAMARK X-6600) — BGA and QFN joints measured for voiding
X-ray component counter
X-ray component counter — incoming reels checked against the BOM
First article inspection
First-article inspection (FAI-8302) on the first board of every run
Final visual inspection
Final visual inspection under magnification to IPC-A-610 Class II or III
Functional test fixture
Functional test fixture with spring probes, built for the specific board
Line 4 — Moulding and assembly

Enclosure and board, same roof

In-house tooling and injection moulding mean the housing is not waiting on a third-party moulder while your boards sit finished in a rack.

Injection moulding hall
In-house injection moulding — tooling and parts under the same roof as the boards
Moulding cell
Moulding cell running enclosure parts for the charger line
Finished goods
Finished GaN chargers staged before export packing
Certification

The paperwork, and where it comes from

Certificates are issued to our Chinese legal entity — Hangzhou Xingkong Zhilian Technology Co., Ltd. The name on the certificate differs from the trading name used on this site. Same company, same plant, same address. That is the only reason the wording differs.

Certificate wall
The certificate wall at the plant entrance — originals, not reproductions
SGS audit
SGS on-site audit; the report is available once an NNN is in place
IATF 16949 certificate
IATF 16949:2016 certificate, issued to the Chinese legal entity

Get the certificate set

Four PDFs, downloadable immediately — no waiting on an email. ISO 9001:2015 in English and in Chinese, IATF 16949:2016, and page one of the SGS audit report. The full SGS report names the client, so that one goes out under a mutual NNN.

Next step

Three ways to close the gap

Pick whichever removes the doubt fastest. None of them require you to send a file first.

Walk the line live

30 minutes on Teams or Zoom. Tell us which process you care about — placement, X-ray, final test — and we point the camera at it, including the parts a brochure would skip.

Book a walkthrough

Read the certificates

IATF 16949, ISO 9001, and the SGS audit report. Ask for the set and we send the scans, including the scope statements and expiry dates.

Request certificates

Sign the NNN first

Non-disclosure, non-use, non-circumvention. Fill it in, sign it, send it back — then the BOM and Gerber can follow with the paperwork already in place.

Open the NNN